Manufacturing Processes (name some)CNC milling, CNC turning, Precision Grinding,  EDM Machining, 3D printing,  Injection molding, Casting, Forging, Aluminum Extrusion, Sheet Metal Fabrication, Surface Finish, etc
Materials (name some)AluminumAL6061, AL6063,AL7075,AL5052, ADC12, A356, etc
Stainless SteelS.S.303, S.S.304, S.S.316, S.S.316L, etc.
SteelTool Steel, Mild steel, Carbon steel, 4140, 4340, Q235, Q345B, 20#, 45#, S136, SKD11, etc
IronSPCC, SGCC,SECC,SPTE,1213, 12L14,1215 etc.
BrassC36000 ( C26800), C37700 ( HPb60), C38500( HPb58), C27200(CuZn37) , C28000(CuZn40), etc
BronzeC51000, C52100, C54400, etc.
PlasticABS, PC, Nylon, PEEK, POM, Acrylic, , etc.
Surface Finish (name some)anodizing, chemical film, oxide, zinc-plated, nickel-plated, chrome-plated, silver-plated, gold-plated, Teflon coating, powder coating, PVD coating, heat treatment, passivation, sandblasting, brushing, polishing,  etc
Tolerance(name some):1. CNC Turning tolerance: +/-0.01mm
2. CNC Milling Tolerance: +/-0.01mm
3. WEDM tolerance: +/-0.01mm
4. EDM Mirror tolerance: +/-0.005mm
5. Precision Grinding: +/-0.005mm
Drawing FormatPDF / DWG / IGS / STEP / STP / X_T
PackingWood case or carton, 1, With plastic bag and pearl-bubble bag. 2, To be packed in cartons or wood cases. 3 Use adhesive tape to seal cartons or nail screws to tighten the wood case. Different packing methods will be chosen according to different projects to ensure safe shipping.
Shipping1) 0-100kg: by express or by air as priority. It takes 3 to 5 days by express, like DHL, UPS, and FedEx. And 7 to 15 days by air.
2) >100kg: by sea as a priority. It takes 25 to 40 days.
MOQ1PCS
Trade TermsEXW, FOB, CIF, As per customer’s request
Payment TermsPayPal or T/T
Lead Time3 to 5 days for top urgent prototypes, and it finally depends on order quantity and complexity.                                For general projects, lead time is 10 to 20 days.